成人午夜福利视频_给我免费播放片高清在线观看视频_超碰在线97免费_国产精品天美传媒沈樵_日韩av综合_91刘玥在线观看未删减

首頁 技術(shù)中心>帕金斯2806發(fā)動機氣門間隙如何調(diào)整方法

帕金斯2806發(fā)動機氣門間隙如何調(diào)整方法

2016/5/8 17:31:58

帕金斯2806發(fā)動機氣門間隙如何調(diào)整方法

How to c heck/adjust the tappet clearances

Special requirements


Operation


Special tools

Tappet clearances

Description

Part number

Inlet

Exhaust

Engine turning tool

CH48

0,8 mm (0.05 in)

0,76 mm (0.00 in)


1

 
The tappet clearance is measured between the rocker levers and the top of the valve bridge pieces. The

operation must be done with the engine cold and stopped. Refer also to Operation -, How to check/adjust

the electronic unit injectors.

 

  Remove the rocker cover, Operation -.

2  Remove the cover (A2) from the flywheel housing. The top bolt (A) is the timing bolt.

Caution: If a customer-fitted speed sensor is fitted to the flywheel housing, it must be removed before the

engine turning tool can be inserted.

  Remove the plug (A) from the timing bolt location in the flywheel housing and fit the timing bolt.

Note: There are two locations for the timing bolt, one at each side of the flywheel housing. Use the location

that is the most convenient.

4  Insert the engine turning tool, CH48, into the fly wheel housing through the aperture behind the cover

(A2). Us e a  /2 inch drive ratchet with the turning tool to rotate the engine flywheel in the normal direction of

rotation (anti-clock wise when viewed on the flywheel) until the timing bolt engages with the threaded hole in

the flywheel. The piston of number  cylinder is now at TDC (top dead centre).

Caution: If the flywheel is turned past the threaded hole, the flywheel must be turned in the opposite direction

for approximately 45 degrees and then back in the normal direction of rotation until the timing bolt engages

with the threaded hole. This is  to eliminate backlash.


Continued


2800

5  Check the inlet and exhaust valves of the number  cylinder. If they are fully closed the piston is on its

compression stroke and the rocker levers can be moved by hand. If the rocker levers can not be moved



because the valves are slightly open, the piston is on its exhaust stroke. If it is on its exhaust stroke, withdraw

the timing bolt and turn the flywheel a further 60 degrees in the normal direction of rotation so that the number

 cylinder is set to TDC on its compression stroke, then insert again the timing bolt.

6 Before each set of tappet clearances is adjusted, ensure that the roller of the rocker lever is fully against the

camshaft lobe.

7 Use a set of feeler gauges, inserted at the position shown (B) between the valve bridge piece and the rocker

lever button, to c heck the tappet clearances for the inlet valves (C) on cylinders , 2 and 4. Adjust the

clearances if necessary. Check the tappet clearance for the exhaust valv es (C2) on cylinders ,  and 5, and

adjust the clearances if necessary.


Continued

Notes:

l  Move each valve bridge piece before the feeler gauge is inserted to reduce the effect of the oil film.

l  During the procedure, ensure that the feeler gauge is fully inserted


2800


8 After each unit has been adjusted, tighten the lock nut (B2) of the adjustment screw (B) to a torque of 0 +/

- 4 Nm (22 +/-  lbf ft).

9  Withdraw the timing bolt and rotate the flywheel by 60 degrees so that the number 6 piston is at TDC on

its compression stroke. Insert again the timing bolt into the threaded hole.

0  Check the tappet clearances for the inlet valves (C) on cylinders , 5 and 6. Adjust the clearances if

necessary. Check the tappet clearances for the exhaust valves (C2) on cylinders 2, 4 and 6, and adjust the

clearances if necessary.

  After each unit has been adjusted, tighten the lock nut of the adjustment screw to a torque of 0 +/- 4 Nm

(22 +/-  lbf ft).

2  Check again the tappet clearances for all six cylinders.

  Fit the rocker cover. Remove the engine turning tool and the timing bolt and fit the cover to the flywheel

housing. Fit the plug to the timing bolt location.


 

免費熱線
400-100-8969???15088860848
機組銷售
0574-26871589? 15267810868
配件銷售
0574-26886646? 15706865167
維修熱線
0574-26871569  18658287286
手機端
微信公眾號
在線客服
主站蜘蛛池模板: 亚洲日本乱码一区二区产线一∨ | 中文字幕在线免费视频 | 不卡高清AV手机在线观看 | 色婷婷综合久久久中字幕精品久久 | 欧美日韩另类国产亚洲欧美一级 | 好硬好湿好大再深一点动态图 | 国产女人叫床高潮视频在线观看 | 亚洲视频入口 | 老王亚洲福利在线观看 | igao视频网站 | 久久成年片色大黄全免费网站 | 四虎永久在线视频 | 免费看的av| 亚洲天堂精品视频 | 一区二区视频国产 | 亚洲精品国产福利一二区 | 蜜桃视频在线观看免费视频网站WWW | 今天高清视频在线观看视频 | 我趁老师喝醉脱她胸罩小说 | 国产综合久久精品 | 国产精品――羞羞答答 | 性欧美videos| 国产激情一区 | 一区二区不卡视频 | 91福利无码国产正在播放 | 91麻豆精品一区二区 | 日韩国产综合 | 亚洲国产在 | 国精产品999一区二区三区有限 | XXXXXHD亚洲日本HD | av大片免费 | 四虎影院黄色 | 香蕉久久丫精品忘忧草产品 | 91麻豆精品激情在线观看 | 天天干天天射天天操 | 日产无码精品一区二区三区 | 欧美一二区 | 狼群社区视频www中文 | 日本一区二区三区精品 | 天天天天天操 | 香蕉网色|