成人午夜福利视频_给我免费播放片高清在线观看视频_超碰在线97免费_国产精品天美传媒沈樵_日韩av综合_91刘玥在线观看未删减

首頁 技術中心>Perkins柴油機如何檢查氣門間隙

Perkins柴油機如何檢查氣門間隙

2016/5/8 15:34:24

Perkins柴油機如何檢查氣門間隙

How to check the tappet clearances

Special tools

Descript ion

Engine turning tool

Tappet clearances


Part number

CH11148


Inlet

Exhaust


0,38 +/- 0,08 mm (0.015 +/- 0.003 in)

0,76 +/- 0,08 mm (0.030 +/- 0.003 in)


1

 

2

 
The tappet clearance is measured between the rocker levers  and the top of the valve bridge pieces. The

operation must be done with the engine cold and stopped. Refer also to "How to check/adjust the electronic

unit injectors" on page 42.

1  Remove the rocker cover.

2  Remove the top bolt (A1) from the cover (A2) on the flywheel housing and slacken the other cover bolt to

allow the cover to open. The top bolt (A1) is the timing bolt.

Caution: If a customer-fitted speed sensor is fitted to the flywheel housing, it must be remov ed before the

engine turning tool c an be inserted.

3  Remove the plug (A3) from the timing bolt location in the flywheel housing and fit the timing bolt.

Note: There are two locations for the timing bolt, one at each side of the flywheel housing. Use the location

which is the most convenient.

4  Insert the engine turning tool, CH11148, into the flywheel housing through the aperture behind the cover

rotation (anti-clockwise when viewed on the flywheel) until the timing bolt engages with the threaded hole in

the flywheel. The piston of number 1 cylinder is now at TDC (top dead centre).

Caution: If the flywheel is turned past the threaded hole, the flywheel must be turned in the opposite direction

for approximately 45 degrees and then back in the normal direction of rotation until the timing bolt engages

with the threaded hole. This is to eliminate backlash.



User’s Handbook, TPD1516E, Issue 1

39


4


2800 Series


5  Check the inlet and exhaust valves of the number 1 cylinder. If they are fully closed the piston is on its

compression stroke and the rocker levers can be moved by hand. If the rocker levers can not be moved

because the valves are slightly open, the piston is on its exhaust stroke. If it is on its exhaust stroke, withdraw

the timing bolt and turn the flywheel a further 360 degrees in the normal direction of rotation so that the number

1 cylinder is set to TDC on its compression stroke, then insert again the timing bolt.

6 Before each set of tappet clearances is adjusted, ensure that the roller of the rocker lever is fully against the

camshaft lobe.

7 Use a set of feeler gauges, inserted at the position shown (B3) between the valve bridge piece and the rocker

lever button, to check the tappet clearances for the inlet valves (C1) on cylinders 1, 2 and 4. Adjust the

clearances if necessary. Check the tappet clearance for the exhaust valves (C2) on cylinders 1, 3 and 5, and

adjust the clearances if neces sary.

Notes:

Move each valve bridge piece before the feeler gauge is inserted to reduce the effect of the oil film.

During the procedure, ensure that the feeler gauge is fully inserted

8  After each unit has been adjusted, tighten the lock nut (B2) of the adjustment screw (B1) to a torque of

30 ± 4 Nm (22 ± 3 lbf ft) 3 ± 0,4 kgf m.

9  Withdraw the timing bolt and rotate the flywheel by 360 degrees so that the number 6 piston is at TDC on

its compression strok e. Insert again the timing bolt into the threaded hole.


Continued



40


User’s Handbook, TPD1516E, Issue 1


2800 Series

10  Check the tappet clearances for the inlet valves (C1) on cylinders 3, 5 and 6. Adjust the clearances if


4

necessary. Check the tappet clearances for the exhaust valves (C2) on cylinders 2, 4 and 6, and adjust the

clearances  if necessary.

11  After each unit has been adjusted, tighten the lock nut of the adjustment screw to a torque of 30 ± 4 Nm

(22 ± 3 lbf ft) 3 ± 0,4 kgf m.

12  Check again the tappet clearances for all six cylinders.

13  Fit the rock er cover. Remove the engine turning tool and the timing bolt and fit the cov er to the flywheel

housing.

14  Fit the plug to the timing bolt location.


User’s Handbook, TPD1516E, Issue 1

 

 

免費熱線
400-100-8969???15088860848
機組銷售
0574-26871589? 15267810868
配件銷售
0574-26886646? 15706865167
維修熱線
0574-26871569  18658287286
手機端
微信公眾號
在線客服
主站蜘蛛池模板: 亚洲欧洲国产视频 | 日本XXXXZZX片免费观看 | 粉嫩呦福利视频导航大全 | 97久久国产成人免费网站 | 一区二区三区四区乱视频 | 欧美性生交18XXXXX无码 | 51久久国产露脸精品国产 | 欧美日日骚| 欧美精品一区二区三区免费视频 | 欧洲熟妇色xxxx欧美老妇多毛网站 | 黄色一级免费网站 | 九九久久99 | 小泽玛利亚一区二区免费 | 久久国产精品久久久久 | 中文字幕在线免费视频 | 精品av在线播放 | 韩日成人 | 国产成人在线免费观看视频 | www.亚洲精品 | 日韩精品免费看 | 中文字幕无线观看中文字幕 | 国产男女猛视频在线观看 | 成+人+网+站+免费观看 | 狠狠躁夜夜躁人人爽天天天天97 | 一国产一级淫片a免费播放口 | 国产国语一级在线播放视频 | 超碰在线免费看 | 97成人超碰| 777奇米888色狠狠俺也去 | 国产日韩欧美一区二区久久精品 | 久久中文字幕AV不卡一区二区 | 欧美精品亚洲人成在线观看 | 亚洲精品一区三区三区在线观看 | 四虎国产 | 免费的成人A级毛片 | 999热精品视频 | 日本一本二本在线 | 又黄又爽的免费视频 | 人妻AV无码一区二区三区 | 中国农村妇女hdxxxx | 亚洲精品在线看 |