成人午夜福利视频_给我免费播放片高清在线观看视频_超碰在线97免费_国产精品天美传媒沈樵_日韩av综合_91刘玥在线观看未删减

首頁 產品展示>John Deere約翰迪爾強鹿柴油發動機搖臂總成的安裝方法

John Deere約翰迪爾強鹿柴油發動機搖臂總成的安裝方法

John Deere約翰迪爾強鹿柴油發動機搖臂總成的安裝方法,John Deere約翰迪爾強鹿柴油發動機搖臂總成的安裝方法技術支持,John Deere約翰迪爾強鹿柴油發動機搖臂總成的安裝方法費用,John Deere約翰迪爾強鹿柴油發動機搖臂總成的安裝方法服務中心,John Deere約翰迪爾強鹿柴油發動機搖臂總成的安裝方法價格規格資料查詢,John Deere約翰迪爾強鹿柴油發動機搖臂總成的安裝方法哪里有,John Deere約翰迪爾強鹿柴油發動機搖臂總成的安裝方法多少錢,John Deere約翰迪爾強鹿柴油發動機搖臂總成的安裝方法附近聯系電話,寧波日昕動力科技有限公司
產品咨詢

詳細描述

John Deere約翰迪爾強鹿柴油發動機搖臂總成的安裝方法

1. Install push rods in same location from which removed.NOTE: Valve stem tips are specially hardened; wear capsare not required.

IMPORTANT: Relieve tension on rocker arm adjustingscrew to avoid damaging rocker armshaft during installation.

2. Position rocker arm assembly on engine.

IMPORTANT: Oil supply hole in rocker arm shaftmust be positioned at the flywheel endof engine and facing downward whenrocker shaft is installed.

3. Lubricate all rocker arms with engine oil and makesure they move freely. Tighten rocker arm supportstuds in a criss-cross sequence to specifications.

Specification

Rocker Arm Support Studs—Torque ............................................................................. 60 N•m (44 lb-ft)

4. Adjust valve clearance. (See CHECK AND ADJUSTVALVE CLEARANCE earlier in this group.)

檢查和調整氣門間隙

IMPORTANT: Valve clearance MUST BE checked andadjusted with engine COLD.

1. Remove rocker arm cover and crankcase ventilatortube.

IMPORTANT: Visually inspect contact surfaces ofvalve tips, bridges and rocker arm wearpads. Check all parts for excessivewear, breakage, or cracks. Replaceparts that show visible damage.Rocker arms that exhibit excessivevalve clearance should be inspectedmore thoroughly to identify damagedparts.

Replace valves, seats, springs andretainers in pairs per cylinder if founddamaged. Also replace bridge if any ofthese parts are replaced.

2. Remove plastic plugs or cover plate from enginetiming/rotation hole (A) and timing pin hole (B).

NOTE: Some engines are equipped with flywheelhousings which do not allow use of an engineflywheel rotation tool. These engines with straightnose crankshafts may be rotated from front noseof engine, using JDG966 Crankshaft Front/RearRotation Adapter.

3. Using JDE83 or JDE81-1 Flywheel Turning Tool, rotateengine flywheel in running direction (clockwise viewedfrom front) until No. 1 cylinder is at TDC compressionstroke. Insert JDG1571 or JDE81-4 Timing Pin inflywheel.

If No. 1 cylinder rocker arms are loose, the engine is at

No. 1 TDC compression.

If No. 1 cylinder rocker arms are not loose, rotateengine one full revolution (360°) to No. 1 TDCcompression.

4. With engine lock-pinned at TDC of No. 1 piston’scompression stroke, check valve clearance to followingspecifications. (Use sequence for 4-cylinder or

6-cylinder engines as outlined on next page.)

Specification

Intake Valve Clearance Checking(Rocker Arm-to-Bridge) (Engine

Cold)—Clearance ................................ 0.31—0.38 mm (0.012—0.015 in.)Exhaust Valve ClearanceChecking (Rocker Arm-to-Bridge)

(Engine Cold)—Clearance................... 0.41—0.48 mm (0.016—0.019 in.)

5. If valves need adjusting, use the appropriate valveclearance adjustment procedure on the next page andadjust to specifications below. Loosen the jam nut (A)on rocker arm adjusting screw. Turn adjusting screw until feeler gauge slips with a slight drag. Hold the adjusting screw from turning with screwdriver and tighten jam nut to specifications. Recheck clearance again after tightening jam nut. Readjust clearance as necessary.

Specification

Intake Valve ClearanceAdjustment (RockerArm-to-Bridge) (Engine Cold)—

Clearance ................................................................... 0.36 mm (0.014 in.)

Exhaust Valve Clearance

Adjustment (RockerArm-to-Bridge) (Engine Cold)—

Clearance ................................................................... 0.46 mm (0.018 in.)

Rocker Arm Adjusting Screw Jam

Nut—Torque .................................................................... 27 N•m (20 lb-ft)

6. Install rocker arm cover and crankcase ventilator tube.

John Deere約翰迪爾強鹿柴油發動機4缸發動機的氣門調整方法

NOTE: Firing order is 1-3-4-2.

1. Using JDG1571 or JDE81-4 Timing Pin, lock No. 1piston at TDC compression stroke (B).

2. Adjust valve clearance on No. 1 and 3 exhaust valvesand No. 1 and 2 intake valves.

3. Turn crankshaft 360°. Lock No. 4 piston at TDCcompression stroke (C).

4. Adjust valve clearance on No. 2 and 4 exhaust valvesand No. 3 and 4 intake valves.

John Deere約翰迪爾強鹿柴油發動機6缸發動機的氣門調整方法

6-Cylinder Engine:

NOTE: Firing order is 1-5-3-6-2-4.

1. Using JDG1571 or JDE81-4 Timing Pin, lock No. 1piston at TDC compression stroke (B).

2. Adjust valve clearance on No. 1, 3 and 5 exhaustvalves and No. 1, 2, and 4 intake valves.

3. Turn crankshaft 360°. Lock No. 6 piston at TDCcompression stroke (C).

4. Adjust valve clearance on No. 2, 4 and 6 exhaustvalves and No. 3, 5, and 6 intake valves.

John Deere約翰迪爾強鹿柴油發動機氣門行程的測量方法

IMPORTANT: For a more accurate measurement,measure valve lift at 0.00 mm (0.00 in.)rocker arm-to-valve tip clearance andwith engine COLD.

NOTE: Measuring valve lift provides an indication of wearon camshaft lobes and camshaft followers or pushrods.

1. Remove rocker arm cover.

2. Using JDE81-1 or JDE83 Flywheel Turning Tool andJDG1571 or JDE81-4 Timing Pin inserted in flywheel,lock No. 1 piston at TDC compression stroke.

3. Set rocker arm-to-valve tip clearance to 0.00 mm (0.00in.) for:

· No. 1 and 3 exhaust and No. 1 and 2 intake valveson 4-cylinder engines.

· No. 1, 3, and 5 exhaust and No. 1, 2, and 4 intakevalves on 6-cylinder engines.

4. Place dial indicator tip on top of valve bridge. Preloadindicator tip and set dial at 0.0 mm (0.0 in.).

5. Remove timing pin from flywheel and manually rotateengine one full revolution (360°) in running directionusing appropriate flywheel turning tool.

6. Observe dial indicator reading as valve is moved to fullopen. Record maximum reading and comparewithspecifications given below.

Specification

Intake Valves—Lift 9.03—9.43 mm(0.356—0.371 in.)

Wear Limit .................................................................. 8.70 mm (0.343 in.)Exhaust Valves—Lift 9.32—9.72 mm(0.367—0.383 in.)

Wear Limit .................................................................. 9.00 mm (0.354 in.)

7. Follow same procedure for all remaining valves andrecord readings.

If valve lift on all valves is within specifications, adjustvalve lash to specified clearance. (See CHECK ANDADJUST VALVE CLEARANCE earlier in this group.)If valve lift on one or more valves is not withinspecification, remove and inspect entire valve train andcamshaft.

8. Rotate engine one full revolution (360°). Lock engineat:

· TDC No. 4 compression stroke for 4-cylinderengines.

· TDC No. 6 compression stroke for 6-cylinderengines.

9. Set rocker arm-to-valve tip clearance to 0.0 mm (0.0in.) for:

· No. 2 and 4 exhaust and No. 3 and 4 intake valveson 4-cylinder engines.

· No. 2, 4, and 6 exhaust and No. 3, 5, and 6 intakevalves on 6-cylinder engines.

10. Repeat steps 4—7.

免費熱線
400-100-8969???15088860848
機組銷售
0574-26871589? 15267810868
配件銷售
0574-26886646? 15706865167
維修熱線
0574-26871569  18658287286
手機端
微信公眾號
在線客服
主站蜘蛛池模板: 99九九99九九九99九他书对 | 欧美日韩在大午夜爽爽影院 | 国产影视一区二区三区 | 操一操摸一摸 | 国产a免费| 欧美a在线 | 成人午夜亚洲 | 大胆GOGO无码不卡播放 | 天天av天天av天天透 | 久久久久日本精品一区二区三区 | 精品美女久久 | 亚洲精品无码高潮喷水A片小说 | 久久久成人av毛片免费观看 | 亚洲精品中文字幕乱码三区91 | 美女视频黄又黄又免费高清 | 伊人热热久久原色播放WWW | 精品无人区一区二区三区在线 | a毛片网站 | 国产成人激情视频 | 国产欧美日韩一区二区图片 | 精品一区二区无码AV | www.久久久com | 久久精品免费国产大片 | 国产精品美女久久久免费 | 亚洲AV成人无码一区在线观看 | 国产亚洲aa在线播放 | 久久久久久久久久久久久女过产乱 | 欧美精品黑人粗大 | 亚洲视频高清不卡在线观看 | www.日本高清 | 亚洲综合在线一区二区 | 精品一区久久 | 无码一区国产欧美视频 | 伊人热热久久原色播放WWW | 日韩欧美高清 | 日韩激情无码不卡码 | 韩国三级高潮爽 | 综合久久久久 | 波多野吉衣视频在线观看 | 4虎最新网址 | 精品999日本久久久影院 |